DRAFT CONCEPT — this is a sample built by Elite Integration for Greenleaf Environmental Services. It is not Greenleaf Environmental Services' live website. Nothing here is published or indexed. elitesystemsdesign.com
Greenleaf Environmental Services logo 970-283-8992
De Beque, CO · Piceance Basin

The only wastewater, solids, and wet-solids disposal facility in the Piceance Basin.

Greenleaf Environmental Services turns oilfield waste streams — wastewater, tank bottoms, drilling mud, cuttings — into treated, permitted, beneficial-reuse products, all from one Mesa County facility.

5 active evaporation ponds 470,953 bbl pond capacity 5,000 bbl/day injection well 7 mi from De Beque, CO
95–99%
of organics & solids removed by water treatment
99%
of heavy metals removed from treated wastewater
99%
of bacteria removed from treated wastewater
285,000
barrels/year evaporation rate, freeing pond space for more disposal
Facility Capacity

Central Piceance Basin location, built for volume.

Greenleaf sits 7 miles from De Beque, CO — a central location that keeps haul distances short for operators across the basin. With trucking and disposal both considered, that makes Greenleaf the most cost-effective wastewater disposal option in the Piceance Basin and surrounding area. Between treatment, evaporation ponds, and the injection well, the facility takes on wastewater at scale without operators needing a second disposal partner.

Aerial view of the Greenleaf Mesa Facility showing the evaporation ponds, solids impoundments, and injection well site
The Mesa Facility, De Beque, CO
One of Greenleaf's lined evaporation ponds, with the Piceance Basin mesas in the background
One of five lined evaporation ponds on site — 470,953 barrels of combined capacity
What We Take

Wastewater, wet solids, dry solids, and beneficial reuse — one facility, four waste streams.

01

Wastewater disposal

5 active evaporation ponds totaling 470,953 barrels of space, plus an injection well built for 5,000 barrels/day of injection capacity. Greenleaf's water treatment system restores wastewater to a useable standard before it's discharged to a pond or injected — removing 95–99% of organics and solids, 99% of heavy metals, 99% of bacteria, and 25% of monovalent cations and anions.

Side-by-side beaker comparison of raw wastewater and Greenleaf's treated water output Raw intake vs. treated output, side by side
02

Wet solids processing

Tank bottoms, drilling mud, wet cuttings, and treatment sludges are dosed with de-mulsification agents to recover oil, then pumped to a mixing tank for separation. Recovered water and oil go to the tank farm for treatment; remaining solids are pressed, dried, and moved to solids impoundments for further treatment.

03

Dry solids disposal

Solids placed in certified Section 3 impoundments receive chemical and biological treatment — a demulsifying chemical process paired with petroleum-feeding bacteria — converting waste to carbon dioxide and water aerobically, in days rather than the years conventional land farming takes. The process handles oil concentrations as high as 30%.

04

Beneficial reuse products

Greenleaf is pursuing permitted beneficial-reuse authorizations across every waste stream it handles — road spray for dust suppression and de-icing, light and heavy brines, and clean water — working toward a future where nothing leaves the facility as waste.

Beneficial Reuse

Working toward complete recycling of every waste stream.

Greenleaf's long-term direction is converting everything delivered to the facility into a permitted, reusable product instead of a disposed one. That work is already underway across three tracks:

01Road spray & brines — a treated-wastewater product for dust suppression and de-icing, plus light and heavy brine reuse 02Road base & precast — solids conversion into durable, non-leaching synthetic ceramic or gravel product 03Energy — a partnership exploring plasma treatment to turn organic waste into syngas and inorganic waste into a neutralized aggregate
Plasma treatment furnace being tested for converting waste into syngas and neutralized aggregate

The plasma treatment process Greenleaf is evaluating in partnership testing — organic waste in, syngas and neutralized aggregate out.

About Greenleaf

Compliance-first disposal, with closure already funded.

Greenleaf serves waste disposal needs across the Piceance Basin and surrounding area, accepting both E&P and non-E&P wastewater and solids. The objective is simple: limit disposal liability through strict compliance with all regulations — and through the reuse and reclassification of the wastes themselves. Every waste stream is treated to an industrial or residential reuse standard before it's placed in an evaporation pond, injected, or moved to a certified Section 3 impoundment.

Strict compliance with all regulations, on every waste stream
Established financial-assurance fund for future closure — minimal cradle-to-grave liability for producers
E&P and non-E&P wastewater and solids both accepted
Imagine What's Next

What a modern front door could do for Greenleaf

None of this exists on the site today — a look at what becomes possible once the refresh is live.

01

Pre-qualifying quote requests

Imagine a load-intake form that asks the right questions up front — waste stream type, estimated volume, truck count — so your team can quote and schedule disposal without a back-and-forth phone tag.

02

After-hours load scheduling

Imagine an assistant that takes disposal inquiries around the clock and texts your team only when a real hauler needs a scheduled slot — no missed loads because a call came in after 5pm.

03

Automatic compliance follow-ups

Imagine manifest and volume confirmations that go out to operators automatically after each drop-off, so your compliance paperwork trail builds itself instead of living in someone's inbox.

Get In Touch

Call for pricing and disposal scheduling.

Greenleaf quotes pricing and disposal details directly — one call to the Mesa Facility covers waste stream, volume, and scheduling.

970-283-8992
Mesa Facility
15655 45 1/2 Road
De Beque, CO 81630
Phone
970-283-8992
Service Area
Piceance Basin & surrounding Mesa County operators
Call 970-283-8992